WE Report

Lessons Learned

Lesson Learned





By: Drilling Engineer

Report No.

5134

Discipline/Origin

Drilling
No origin

Well

Carmen
35/10-10S

Date created

2023/04/10
972 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Equipment
Negative

Deepsea Yantai


What happened in Surface section:
It was difficult to stab in the 20″ casing joints with 15 ft bails and rig movement

What Was Planned

To run the 20″ casing with CRTi and FMS

What Was Learned

Have a 20″ manual stabbing guide on drillfloor. would have helped as centralizers was placed too low. A stabbing guide will help if there is a lot of rig movement. More difficult to stab as 15ft bails are in use.

What Actions Are Required

Have a 20″ manual stabbing guide on drillfloor.